尊龙凯时·「中国」官方网站

04
News
关闭
COMMUNICATION CABLEELECTRIC HEATING SYSTEM
In recent years, through continuous investment in research and development and the introduction of high-end equipment, ZTC has established a fully automated production line for cutting, winding, welding, inspection, and packaging. This has led to achievement in production efficiency, product qualification rate, and the stability and consistency of quality.
Specific Process Flow
01
INSULATION
ZTC is equipped with  ROSENDAHL insulation devices imported from Austria.
02
TWIST
03
LAY-UP
ZTC is outfitted with the lay-up machinery of DELACHAUX from France, which is introduced for its variable pitch capability and enables the achievement of external crosstalk performance with a high margin.
04
SHEATH
05
WINDING
友情链接: